be transported through existing pipelines to the Miller oil field in
the North Sea, where it would be injected into a reservoir four
kilometres below the sea bed to help extract an extra 60m barrels
Miller oil field by up to 20 years, allowing an estimated 57 million
barrels of oil, which is not currently recoverable, to be produced.
Article Source
-
http://www.scotland.gov.
CO2 would be exported to BP’s Miller oil field in the
North Sea for EOR and storage.
Engineering and design costs for the Peterhead project are being
estimated.